Baykan Energy Group Hydroelectric Power Plant
Name of Work
Baykan Energy Group Hydroelectric Power Plant
Name of Administration
Bidaş Enerji Sanayi Ticaret A.Ş.
Project Status
Tamamlanan Proje

Project Details
The Baykan Dam and HPP Project is located in the Baykan district of Siirt province. The project consists of 3 structures (Baykan-I 50 MW, Regulator 20 MW, Baykan-II 54 MW) with a total installed capacity of 114.05 MWm / 111.18 MWe, and was granted its license on 20.03.2025. The plant has an annual energy generation capacity of 374,050,000 kWh. The total investment cost is USD 146,000,000.