| Name of Work |
| Baykan Energy Group Hydroelectric Power Plant |
| Name of Administration |
| Bidaş Enerji Sanayi Ticaret A.Ş. |
| Project Status |
| Tamamlanan Proje |
| Project Details |
| The Baykan Dam and HPP Project is located in the Baykan district of Siirt province. The project consists of 3 structures (Baykan-I 50 MW, Regulator 20 MW, Baykan-II 54 MW) with a total installed capacity of 114.05 MWm / 111.18 MWe, and was granted its license on 20.03.2025. The plant has an annual energy generation capacity of 374,050,000 kWh. The total investment cost is USD 146,000,000. |